Construction has started

Image
Our house is progressing very quickly. Within a month we have had our slab poured, frame delivered and constructed. It is a very exciting process for us.  1. Fencing and toilet delivery  completed date: 20th March 2. Internal drainage  completed date: 27th March 3. Slab completed 2nd of April 4. Framing commenced 20th April

Site Clearance and Tree Removal

Development Approval (DA)

Image
Development Application Lodged:  15 Jan 2020 Development Application   approved:  14 Feb 2020

Electrical Appointment

Electrical Appointment knowledgeable Electrical Consultant took us through all the elements that We can choose for our new home and ensured We tick off all of your requirements.

Internal Selections at My Choice Studio

Image
Bathroom Selections: Wall hung vanity: Laminex Milano Walnut Natural Finish 588 Benchtop: Caesarstone Nordic Loft Tile splashback:Subway tile in Lantic Gloss with Midnight grouting Wet area tiling: Karl Bone 300x450x9mm with Mudberry grouting Floor tiles: Bellongen Woodstone 450x450x7.3mm with Olive grouting Laundry Selections:   Benchtop: Laminex Stone natural finish 167 Cabinetry: Laminex Milano Walnut Natural Finish 588 Tiled splashback: Subway tile in Lantic Gloss with Midnight grouting Wet area tiling:  Karl Bone 300x450x9mm with Mudberry grouting Floor tiles: Bellongen Woodstone 450x450x7.3mm with Olive grouting Kitchen Selections:  Benchtop: Caesarstone in Shitake 4230 Cabinetry: Laminex Chamois Natural Finish 325 Overhead cabinetry and integrated fridge: Laminex Walnut Natural finish Splashback tile: Subway tile in Lantic Gloss with Midnight grouting Appliances:  Fridge: Fisher & Paykel Integrat...

Contract Issued / Appointment Scheduled / Plan Drawings Appointment

Image
Plan Drawings Appointment Our Plan Presenter guided us through the plans to our new home that have been prepared in conjunction with your accepted Consolidated Tender. We are pleased to say MJH have been cooperative with us in making structural changes to the house. We had changed many things around to get the perfect house. We can’t say it was smooth sailing but we are initially happy with the outcome.  Some of the structural changes we made were the following : Guest Bedroom in lieu of Study, Shower and vanity in the Powder room, Sliding door in Pantry to access Laundry, Relocation of Master Suite for open living space on the First floor, Relocation of the Main bath in between Bedrooms 3 and 4, Access to the Main bathroom from Bedroom 3, Higher Ceilings Some upgrades we made during our plans appointment: Shampoo Recess, Gas points to Children’s Activity and Living, Water and Gas point in Alfresco, Flyscreens to almost all windows  Contract Issued...

External Colour selections at Austral Bricks

Image
Builder: Mc Donald Jones House Design: Bridgetown Executive 43 Hebel render finish to the whole house: Taubmans Flotsam Roof: Monier Roof tiles in Sambuca Fascia: Night Sky Gutter: Night Sky Water Tank: Monument Garage door: Dynamic Slimline in Monument Windows: Monument Matt Front door: Newington XN5 (1200mm X 2340mm) in Caoba stain with clear glass and 2 sidelights Front door handle: Digital Entrance Ambassador Leverset Balcony timber cladding: Caoba  Handrail: Monument Matt Feature pier: To be completed after handover  No upgrades were made during the external appointment.